La Gaceta de Salamanca, September 25, 2009
has placed a dogleg and metal in the three great arches of the crossing, already covered, to use this space and avoid any deterioration of the work performed.
Work on the Basilica of Santa Teresa have entered a new phase to run a plasterboard wall inside the temple and insulated sheet metal as an enclosure outside the sanctuary area.
This gigantic wall closing the gap stands of
is seen from inside the temple grounds as a separate area that still needs to be run and will have the main entrance to the Basilica as an entry. The construction work on this front door will undertake in the months since, it is estimated that implementation of this gateway is the last phase of the work, which is scheduled for later this year. In these weeks
is also proceeding to the placement of crystals in the openings of the walls of the temple to prevent the pigeons, who have colonized the top of the Basilica, to enter the area just concluded and damage.
In the highest part of the drywall enclosure of the sanctuary have also placed several windows can provide a warm natural light inside the temple. Moreover, as stated by the vicar of the diocese, Florentino Gutierrez "We have to push through the Basilica. It is completing the first part of the work but to cover it entirely and if we help would be great. It will be a tourist attraction and important asset for the town ". It is estimated that in order to complete the work, will require at least 1 million euros.
0 comments:
Post a Comment