in recent weeks has carried out the cover of the ambulatory of the Basilica. At this time is running out of wood covered with the ambulatory and placed in the coming days, the exterior copper roof, as has been done with the chapel of the head and the presbytery. Is also under the water supply for the area of \u200b\u200bservices and the sacristy (a both sides of the sanctuary).
0 comments:
Post a Comment